Stormwater Pipe Repair East
This project included the removal and replacement of approximately 2,200 linear feet of underground piping ranging in size from 15” to 60”.
The in-place lining included up to approximately 5,200 linear feet of storm sewer pipe ranging in size from 12” to 30”., and removal and replacement of 23 storm structures (inlets, junction boxes, etc.) and associated site repairs.
The repairs were made at 35 separate locations within the city. Construction also included surface restoration (concrete curb and gutter, concrete sidewalk, concrete inlet tops, street repair, sod and other items).
I-Solutions complied with all applicable road closure requirements and provided required barriers, guards, signs and flaggers throughout the project to ensure all state and local traffic control requirements were followed.
Public safety requirements were strictly enforced and additional safety measures were taken as needed during construction.
Each road closure was planned in advanced with the fire chief, county sheriff and other government officials a minimum of seven days in advance.